Energy Generation

98,000 KWH


Client / Company

Sunpin Solar


Project Location

Imperial County,CA

 

Project Information

The 98 MWdc Titan Solar 1 Energy Project is Sunpin Solar¡¯s second large utility-scale solar project in Imperial Irrigation District (IID) territory following its successful development of the 75 MWac ColGreen North Shore Project in 2018. The project is situated on a 569-acre parcel between the beautiful Salton Sea and Anze Borrego Desert State Park in Imperial County, California. It reaches the commercial operation date on December 18, 2020. The single-axis tracking solar project will generate over 218,000 MWh annually, which is enough to power over 26,900 homes annually.


Scope of Project

The 98 MWdc Titan Solar 1 Project brings clean renewable energy to the community, as well as hundreds of short and long term jobs. The annual energy production of the project is equivalent to:


¡¤ No upfront capital is required to participate in the project.

¡¤ Protects against fluctuations in electricity prices.

¡¤ Provides the option to stabilize intermittent solar power supply.

¡¤ Supply of Portfolio Content Categories 1 (PCC-1) refers to specific energy content.

¡¤ PPA terms offer flexibility with shorter duration, index-plus pricing, and more options.

¡¤ Naming rights of the solar farm allow branding or sponsorship opportunities.

¡¤ Tax equity investment option provides potential tax benefits for investors if needed.


 
 

 

 

 